# 6 years of commit visualized

DevFeed: [6 years of commit visualized](<https://devfeed.tech/articles/6-years-of-commit-visualized-20689.md>)

Original publisher: [Read original article](<http://antirez.com/news/98>)

Author: Antirez

Published: 2015-11-20T10:58:34Z

Content type: article

Language: en

Sources: [Antirez](<https://devfeed.tech/sources/antirez.md>)

Topics: [plotting](<https://devfeed.tech/topics/plotting.md>), [version-control](<https://devfeed.tech/topics/version-control.md>)

Tags: [2015](<https://devfeed.tech/tags/2015.md>), [commits](<https://devfeed.tech/tags/commits.md>), [git](<https://devfeed.tech/tags/git.md>), [graph](<https://devfeed.tech/tags/graph.md>), [patch](<https://devfeed.tech/tags/patch.md>), [plotting](<https://devfeed.tech/tags/plotting.md>), [redis](<https://devfeed.tech/tags/redis.md>), [release](<https://devfeed.tech/tags/release.md>), [releases](<https://devfeed.tech/tags/releases.md>), [script](<https://devfeed.tech/tags/script.md>), [tcl](<https://devfeed.tech/tags/tcl.md>)

## AI overview

The visualization covers about 90% of Redis commits, with each commit shown as a rectangle whose height represents affected lines on a logarithmic scale; gray labels mark releases. Commit volume stayed fairly steady, while patch releases slowed after feature backports to later 3.0 releases stopped. Patch releases for a major version tend to taper as it matures, with fewer critical bugs and attention shifting to newer releases. The author describes major releases as increasingly evenly spaced and says Redis was aiming for three time-driven major releases per year, each with less new content; Redis 3.2 RC was then expected in December 2015. The graph was generated with a Tcl script.

## Source excerpt

Today I was curious about plotting all the Redis commits we have on Git, which are 90% of all the Redis commits. There was just an initial period where I used SVN but switched very soon. Full size image here: http://antirez.com/misc/commitsvis.png !~! Each commit is a rectangle. The height is the number of affected lines (a logarithmic scale is used). The gray labels show release tags. There are little surprises since the amount of commit remained pretty much the same over the time, however now that we no longer backport features back into 3.0 and future releases, the rate at which new patchlevel versions are released diminished. Major releases look more or less evenly spaced between 2.6, 2.8 and 3.0, but were more frequent initially, something that should change soon as we are trying to switch to time-driven releases with 3 new major release each year (that obviously will contain less new things compared to the amount of stuff was present in major releases that took one whole year). For example 3.2 RC is due for December 2015. Patch releases of a given major release tend to have a logarithmic curve shape. As a release mature, in general it gets less critical bugs. Also attention shifts progressively to the new release. I would love Github to give us stuff like that and much more. There is a lot of data in commits of a project that is there for years. This data should be analyzed and explored... it's a shame that the graphics section is apparently the same thing for years. EDIT: The Tcl script used to generate this graph is here: https://github.com/antirez/redis/tree/unstable/utils/graphs/commits-over-time Comments