# How to lower Android™ development costs by removing hardware from the critical path

DevFeed: [How to lower Android™ development costs by removing hardware from the critical path](<https://devfeed.tech/articles/how-to-lower-androidtm-development-costs-by-removing-hardware-from-the-critical-path-88513.md>)

Original publisher: [Read original article](<https://ubuntu.com//blog/lower-android-development-cost>)

Author: Bertrand Boisseau (Bertrand Boisseau)

Published: 2026-10-16T09:50:26Z

Content type: article

Language: en

Sources: [Ubuntu blog](<https://devfeed.tech/sources/ubuntu-blog.md>)

Topics: [cloud-infrastructure](<https://devfeed.tech/topics/cloud-infrastructure.md>), [Android Studio](<https://devfeed.tech/topics/android-studio.md>), [mobile devops](<https://devfeed.tech/topics/mobile-devops.md>), [lead time](<https://devfeed.tech/topics/lead-time.md>)

Tags: [anbox](<https://devfeed.tech/tags/anbox.md>), [anbox-cloud](<https://devfeed.tech/tags/anbox-cloud.md>), [anbox-cloud-appliance](<https://devfeed.tech/tags/anbox-cloud-appliance.md>), [android](<https://devfeed.tech/tags/android.md>), [android-studio](<https://devfeed.tech/tags/android-studio.md>), [ci](<https://devfeed.tech/tags/ci.md>), [ci-cd](<https://devfeed.tech/tags/ci-cd.md>), [containers](<https://devfeed.tech/tags/containers.md>), [cost](<https://devfeed.tech/tags/cost.md>)

## AI overview

The article explains that Android development costs include device procurement and maintenance, lab operations, and engineering time lost while waiting for shared hardware. It recommends moving workloads that do not require physical components to on-demand cloud environments, using containers or virtual machines as appropriate and reserving physical devices for hardware-dependent validation.

## Source excerpt

As an Android developer, you'll almost always have access to a device. However, when handling hardware, the device that you actually need often happens to be already in use, set up incorrectly, stored in another lab, or simply waiting to be reset. That's when Android development costs start to increase. Because it's not just the [...]